Verify in the installed environment

Site Acceptance Testing (SAT)

Formal verification that installed systems operate safely, correctly and in accordance with project requirements under site conditions.

Why it matters

Factory-tested equipment must still prove itself after installation and integration.

Site wiring, pipework, software, utilities, settings, interfaces and environmental conditions can introduce issues that do not exist in the factory. SAT verifies the complete installed condition.

Neo controls readiness, functional tests, integrated interfaces, evidence and acceptance so that testing supports confident handover.

01Define clear requirements and acceptance criteria
02Verify progress using objective engineering evidence
03Control risk before it affects programme or operation
Neo methodology

A structured route from requirement to acceptance.

Each assignment is adapted to the project while retaining consistent governance, evidence and reporting standards.

01

Review

Confirm mechanical completion, approved procedures, utilities, permits, evidence and witnesses.

02

Verify

Inspect the installed system, interfaces, settings, calibration and pre-functional condition.

03

Demonstrate

Execute functional, alarm, interlock, performance and integrated tests.

04

Accept

Record results, close defects and issue the agreed SAT acceptance position.

Scope of support

Practical engineering support.

  • SAT strategy, scripts, readiness reviews and witness plans
  • Installed-condition and pre-functional verification
  • Functional, alarm, interlock and control sequence testing
  • BMS, PLC, third-party and system interface verification
  • Performance tests, reliability runs and recovery testing
  • Defect management, reporting and client acceptance support
Typical deliverables

Controlled outputs.

  • SAT procedure and readiness checklist
  • Functional and integrated test scripts
  • Witness records and objective test evidence
  • Performance and reliability test records
  • SAT defect and retest register
  • SAT report and acceptance recommendation
Client outcomes

Engineering work that improves project certainty.

Integrated assurance

Confirm that equipment works with permanent services, controls and adjacent systems.

Controlled witnessing

Give clients and stakeholders clear prerequisites, scripts and expected results.

Reduced handover risk

Resolve functional and interface issues before operational responsibility transfers.

Traceable acceptance

Create an auditable record of what was tested, deferred, failed, corrected and accepted.

Frequently asked questions

Clear answers before mobilisation.

Should SAT start before mechanical completion?

Normally no. SAT should begin only when the defined system is complete, safe and supported by the required evidence, except where a controlled phased strategy has been approved.

How is SAT different from integrated systems testing?

SAT typically proves an installed system or package. Integrated systems testing demonstrates the interaction of multiple systems under normal, failure and recovery scenarios.

Can Neo lead the tests or only witness them?

Both. Neo can develop and lead the SAT programme, provide independent witness support, or integrate with the existing commissioning team.

Start a project discussion

Bring structure, evidence and operational focus to your next project.

Tell us what stage the project is at, where control is being lost and what outcome is required.

Discuss your requirement